Electrical Mining Services
- Electrical Mining Service
ECOFARM I
Max. 80 Amp
Includes: installation materials and operator’s labor.
Specify the amount of amps you need, according to the consumption of each new rig to install.
By example, our EcoMark I rig has an estimated consumption of 5 AMP (at 220v power supply), according to this calculation for the installation of 2 additional rigs, 10 AMP additional would be necessary.
Working Time: 8 days
- Electrical Mining Service
ECOFARM II
Max. 250 Amp
Includes: installation materials and operator’s labor.
Specify the amount of amps you need, according to the consumption of each new rig to install.
By example, our EcoMark I rig has an estimated consumption of 5 AMP (at 220v power supply), according to this calculation for the installation of 2 additional rigs, 10 AMP additional would be necessary.
Working Time: 8 days
Cooling and Airflow Systems
- Systems
A/C Cooling Solution
Includes: A/C equipment, installation materials and operator’s labor.
INQUIRE NOW AND OUR TEAM WILL CONTACT WITH THE SOLUTION
Working Time: 3 Days
- Systems
AIRFLOW SOLUTION*
Includes: airflow equipment, installation materials and operator’s labor.
*inflow and outflow air solution